How to analyse time usage?

One of the many reports available in Evocon is the time usage report on planned production time. The report gives insight into how planned production time is divided between good production, slow production and downtime (planned and unplanned production stops and stops that were left uncommented). Data is visualised so you can easily see how proportions of the different groups change over time. This helps you understand if you what you are doing is helping turn production stops to good production time.

How does the time usage report work?

  1. Go to Reports and choose “Time usage” from the report menu.
  2. Select a timeframe that you are interested in.
  3. Select how the data is separated – whether data is shown for single days or combined for weeks, months or years.
  4. Select how time usage is viewed – either based on stations, products, operators or shifts.
Analyse planned production time with the time usage report

Note: If the selected date range and data separation parameter require the chart to display more than 30 values, the system automatically changes the separation on the chart. For example, if the separation is set for days but the selected time period is 45 days the chart will be displayed in weeks.

How to get more out of the time usage report?

There are many ways you can enhance the analysis of your time usage report. Try them out and see what works best for you.

Analyse your production time usage

If you have any questions about the OEE report then contact our support.